| Date: |
9-23-2012 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Bell Crank and wing attach blocks |
|
|
Deburred and riveted right bell crank assembly. Right bell crank complete. Sanded and preped right main spar Fabricated 20 Center spaces (W14-02), Ten for each wing. Maria helped and sanded and finished the edges on the pre-fabricated spar. Completed the wing attach blocks |
||