| Date: |
2-11-2008 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Left Elevator Work |
|
|
Primed Counterbalance Rib and Tip Rib. Removed some material from the counterweight to fit inside counterweight skin. Attached to ribs and fit counterweight skin. Drilled out 2 screw holes for securing counterweight at a later time. Assembled ribs and spar and clecoed into the skin for match drilling. Match drilled skin to the ribs and spar. Removed and deburred skin. |
||