Date:    2-11-2008
Number of Hours:    2.00
Brief Description:    Left Elevator Work
Primed Counterbalance Rib and Tip Rib.

Removed some material from the counterweight to fit inside counterweight skin. Attached to ribs and fit counterweight skin. Drilled out 2 screw holes for securing counterweight at a later time.

Assembled ribs and spar and clecoed into the skin for match drilling.

Match drilled skin to the ribs and spar. Removed and deburred skin.