| Date: |
8-9-2009 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Vertical Stabilizer |
|
|
Mounted the vertical stabilizer and adjusted the swing. Back drilled for rivets and bolts and fixed the location to be absolutely vertical. |
||