| Date: |
5-15-2009 |
|
| Number of Hours: |
7.30 |
|
| Brief Description: |
Flaps |
|
|
Drilled the trailing edge on the right flap. Riveted the ribs and other structural parts to the spar. Started riveting the top and nose skins on the left flap. |
||