Date:    4-24-2009
Number of Hours:    6.50
Brief Description:    Right Leading Edge and Tank
Marnie helped me rivet the right leading edge ribs. Got the LE skins riveted and the tank placed on the spar. Torqued the attach bracket bolts and installed half the screws.