| Date: |
3-9-2009 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Left Fuel Tank |
|
|
Fabricated the attach angle and reinforcement plates. The attach angle will be used to bolt the tank to the fuselage. Drilled the rivet holes for the fuel drain flange and fuel filler cap. |
||