Date:    5-13-2006
Number of Hours:    4.00
Brief Description:    Elevator Cutout
Cut out a portion of the left elevator trailing edge for installation of the trim tab. Also fabricated the channel that reinforces the hinge area. Next comes layout of the rivet line for the hinge, and fabrication of the trim tab itself.