| Date: |
4-28-2006 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Installed Elevator Hinge |
|
|
Installed the hinge on the horizontal stabilizer. As instructed, I'm waiting to rivet until the elevator has been built and fitted. Next step is fabrication of elevator parts. |
||