Date:    7-14-2020
Number of Hours:    3.00
Brief Description:    Vert stab work continues
Drilled the hole in the LE rib for the wire conduit. Surface prepped the VS-801PP skin and wiped the skin and all parts down with alcohol to remove the scuffing residue. Next step dimpling all parts and skin.