| Date: |
7-14-2020 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Vert stab work continues |
|
|
Drilled the hole in the LE rib for the wire conduit. Surface prepped the VS-801PP skin and wiped the skin and all parts down with alcohol to remove the scuffing residue. Next step dimpling all parts and skin. |
||