| Date: |
6-2-2020 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Riveting HS rear spar |
|
|
Finished riveting spar stiffeners to rear spar using pneaumatic squeezer. Love this tool. Riveted elevator hinge brackets to rear spar. Struggled a bit getting a proper squeezer on the -7 rivets as they seemed a little long but what was speced in the planes. Mic'ed them and all within specs. Bolted center bearing block to spar, will need to borrow a inch-lbs torque wrench to finalize. |
||