| Date: |
12-30-2018 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Right Horizontal Stab Work |
|
|
Good day in the shop. Built up the right horizontal stab. I already had the ribs prepped so build up went quick. As expected, it went together much faster than the left. Got it all built up, HS-0005 and HS-0006 rib flanges drilled and then clamped in place. Match drilled and reamed all holes in skins to ribs. Got a little work to finish on HS-702 spar, HS-00003 , HS-810 and HS-814. |
||