| Date: |
10-8-2018 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Rear Spar Work |
|
|
Match drilled all holes on rear spar reinforcement bars. Clecoed elevator hinge brackets in place and match drilled. Assembeled center elevator hinge/bearing and match drilled left and right bracket thru bearing housing. |
||