| Date: |
7-25-2012 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Right Wing Bottom Fabric Work |
|
|
I decided to brave the heat in the hangar and get some more work done. I installed the last of the inspection rings on the left wing. It's ready to mount on its wing rotisserie. I also started with the last of the fabric on the bottom of the right wing. I glued down the leading edge seam, ironed it into place and then did the final gluing. |
||