Date:    7-4-2012
Number of Hours:    2.20
Brief Description:    Left Wing Bottom Shrink
I glued down both the inboard and outboard edge areas of the bottom fabric. With all of the edges secured, I did the initial shrink of the left wing bottom fabric. I'll come back next session and start with the installation of all the inspection panels.