| Date: |
11-25-2011 |
|
| Number of Hours: |
2.70 |
|
| Brief Description: |
Aileron and Gear Leg Work |
|
|
Finished all the taping actions on the right aileron. While waiting for the last of the glue to dry, I fabricated and installed the copper brake line on one of the gear legs. I also applied the fabric to the bottom half of the same gear leg assembly. |
||