Date:    6-6-2014
Number of Hours:    3.00
Brief Description:    Work on Left Wall Interior
I cut and fitted the holes for the fuel valves and pitch trim handle in the left interior wall piece. After painting the fuel valve covers, I installed their proper labels and fit them onto the left wall piece.