Date:    1-2-2013
Number of Hours:    2.50
Brief Description:    Generator Clean-up
I removed the generator from the engine, dis-assembled the unit, and cleaned the parts. I replaced the bearings and cleaned up the commutator, and re-assembled the unit. I painted the exterior, making it all ready to re-install on the engine.