| Date: |
11-5-2011 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Tape and Inspection Ring Work |
|
|
Installed the center stringer tape. Also, installed the three inspection panel frames on the right rear fuse area. I cut the inspection frame holes for both sides. I have three tapes left to install, and then we will be ready for EkoFill application. |
||