Date:    11-5-2011
Number of Hours:    2.50
Brief Description:    Tape and Inspection Ring Work
Installed the center stringer tape. Also, installed the three inspection panel frames on the right rear fuse area. I cut the inspection frame holes for both sides. I have three tapes left to install, and then we will be ready for EkoFill application.