Date:    10-4-2011
Number of Hours:    2.50
Brief Description:    Side Panel Covering
I finished the shrinking of the left side panel, and started the work on the right side. I started fitting the fabric to the right sides of the fuselage, then started working my way around the frame doing the final cuts, pinking, and gluing. With working around the door frame, there's a bunch more work to do, but I'm happy with my first shot at transitioning from the fuse sides to the vertical stab. The shrinks have not been done yet, but I feel like I have a good lay of the fabric in that area.