| Date: |
11-29-2012 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Generator Clean-up |
|
|
I removed the generator from the engine, dis-assembled the unit, and cleaned up the parts. I replaced the two ball bearings, cleaned up the commutator, and re-assembled the unit. I painted the exterior of the unit. The generatpr is now all set to be re-installed on the engine. |
||