| Date: |
11-12-2017 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Avionics access door Part 2 |
|
|
I marked out the location of the #8 screw holes that I wanted on the doubler. Once the edges of the access opening were smoothed, I clamped the door and doubler into place on the bulkhead and made sure they lined up correctly. Then the doubler, bulkhead and door were match drilled starting with #40, and up drilled to #19. |
||