Date:    10-13-2016
Number of Hours:    4.00
Brief Description:    Floor assembly.
Prepared all lthe seat floors and foot well parts for assembly, all parts deburred and edges smoothed.
Seat floors and baggage floor installed and match drilled to substructure.
Aft flight control mount F-837-1 installed and aft mount holes drilled up to size #12.