| Date: |
11-6-2015 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Preparing the Aileron Attach Brackets. |
|
|
Prepared the Aileron Attachment Brackets for mounting. Clecoed the A-406-1 and the A-407 Aileron Brackets to the left and right ailerons. Drilled to size #12 for attach bolts. Labeled, deburred and primed as necessary, then attached and torqued the AN Bolts. |
||