| Date: |
4-13-2015 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Preparing the elevator skins |
|
|
Dimpled the E-615 trim reinforcement plate to accept flush rivets. Dimpled the E-616 trim cover plate to accept flush AN507-6R6 screws. Trimmed the K1100-06 platenuts so the dont overlap the trim plate and interfere with the trim motor mounts later. Edge finished the elevator skins with 800 grit paper on a sanding block. |
||