| Date: |
2-25-2015 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Finishing the Vertical Stabilizer |
|
|
Today I was able to finish riveting the vertical stabilizer. I attached the rear spar with clecos and then riveted it into place with a hand squeezer. Continued around the perimeter and final attached the the top and bottom ribs. Another sub-assembly complete. |
||