Date:    2-25-2015
Number of Hours:    5.00
Brief Description:    Finishing the Vertical Stabilizer
Today I was able to finish riveting the vertical stabilizer. I attached the rear spar with clecos and then riveted it into place with a hand squeezer. Continued around the perimeter and final attached the the top and bottom ribs. Another sub-assembly complete.