| Date: |
10-31-2014 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Match drill stiffeners, rear spar, hinge brackets |
|
|
Cleco'd then match drilled the HS reinforcement bars to the HS rear spar. Cleco'd and match drilled the elevator hinge bracket to the HS rear spar assembly. Prepared the VA-146 bearing by match drilling with supporting hinge brackets. Deburred all parts. Primed theVA-146 bearing and viveted in place between the two hinge brackets. |
||