| Date: |
5-11-2013 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Nose Gear Assemble |
|
|
INstalled the Beringer nose wheel and fork on to the nose gear leg. Installed the Antispalt aero nose job too, (nose leg reinforcement) |
||