| Date: |
2-17-2013 |
|
| Number of Hours: |
12.00 |
|
| Brief Description: |
Fitted Empennage |
|
|
Installed the Horizontal and Vertical stabilizer and Rudder. Fabricated the shims, located and drilled all the holes and aligned everything in accordance with the manual. Once this was complete i ran the rudder cables and trim cable and got those fitted up. Afterward i disassembled everything and got it hung back on the wall. |
||