| Date: |
11-4-2012 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Install Tail Tie Down |
|
|
I installed the fabricated AEX tail tie down and riveted it in place. I left open four holes that are lated through bolted with the vertical stabilizer. I also finished off the flush skin rivets to the F712 double rear bulkhead which were left un-done (presumably for those opting for a tail-wheel whereas this rear section is slightly different. |
||