Date:    6-16-2012
Number of Hours:    4.00
Brief Description:    Front Wing Spar Prep
Finished riveting the various plate nuts to the front wing spars. Fabricated the wing tie down brackets and tapped the holes to recieve the tie down bolts. When installed there are fastner holes here that also hold the aileron bell crank brackets which I also installed. I primed the wing tied down brackets with SW 988 GPB rattle can prior ton installing. I tourqued the lock nuts to 25 inch lbs. and marked with torque seal. I set the front wing spars off to the side and started in on the rear spar.