| Date: |
12-19-2011 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Fwd/Upper Fuselage Structure |
|
|
Today I rounded up the parts that make up the fwd/upper fuselage structure. I positioned and drilled the 3 ribs and the bulkhead that will be fwd of the instrument panel. Not a lot of good info from the drawings to go off of on this part so I improvised on some of it. I have been researching the drawings for details on the instrument panel installation and haven't come up with much. |
||