Date:    7-9-2011
Number of Hours:    6.00
Brief Description:    Floor nutplates/baggage bulkhead
I almost finished installing the nutplates in the cabin area floor ribs. Still waiting on more nutplates. I was able to fit and drill the lower baggage bulkhead. Next step will be to trim and fit the upper baggage bulkhead and match drill it to F606.