| Date: |
6-8-2011 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Aft deck |
|
|
Began installation of the F614 aft deck. Checked the fuselage for twist and it was fine so I clamped the F609 bulkhead and the aft deck in place and pilot drilled it #40 for now. I want to leave it for now till after I match drill the horizontal and vertical stabs. After that's done I will drill the holes to thier final size. |
||