| Date: |
8-21-2012 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Right wing tank preparation and assembly |
|
|
Took a leave while summer happened and a Toy Hauler needed renovating. The right tank is ready to be dimpled now, the installation of the conductive senders is next and then on to the preparation of drains and fuel caps. |
||