| Date: |
5-26-2012 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
|
|
|
I drilled the joint tank and leading edge strip with the ribs and leading edge, I need to finish by doing the entire match drill of the leading edge and ribs/ |
||