| Date: |
1-3-2012 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Trim motor and package |
|
|
Read the instruction for the trim motor and began the process of utilizing the pieces of aluminum from the RV 6 kit. All measured the same thickness, size and etc. I decided to use the pieces and complete the trim installation. The rivets sent with the bag from Vans were AN426 3-3 and the plans called for AN426 3-3.5 I found the rivets from the previous RV 6 and used them to secure backing plate to the elevator skin. I liked the way it all went together. |
||