| Date: |
6-9-2012 |
|
| Number of Hours: |
2.25 |
|
| Brief Description: |
Vertical Stab Rib Fabrication |
|
|
Cut to size and shape the T10-01 Root Rib from channel stock Cut to size and shape T10-02 Rib #2 from channel stock Trimmed and bent both ends as per plans Cut to size and shape T10-02 Rib #3 from channel stock Trimmed and bent both ends as per plans |
||