| Date: |
4-28-2012 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Vertical Stab Spar Fabrication cont. |
|
|
Trimmed and bent T12-03 & T12-08 to shape Cut to size and shape T12-04 Lower Spar Channel from channel stock Positioned and drilled 1" hole in Loer Spar Channel using a stepped unibit Drilled pilot holes in T12-10 Clip |
||