| Date: |
7-7-2009 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Up-Drilled Left Fwd Fuselage |
|
|
Up-drilled all holes to final size. Most were drilled to #30 (1/8"). The motor mount brackets, rudder pedal mount, and angle piece that attaches to the seat belt bracket were all updrilled to 3/16" for AN3 hardware. The seat belt attach point was up-drilled to 5/16". Disassembled all parts in preparation for deburr. |
||