Date:    7-7-2009
Number of Hours:    1.50
Brief Description:    Up-Drilled Left Fwd Fuselage
Up-drilled all holes to final size. Most were drilled to #30 (1/8"). The motor mount brackets, rudder pedal mount, and angle piece that attaches to the seat belt bracket were all updrilled to 3/16" for AN3 hardware. The seat belt attach point was up-drilled to 5/16".

Disassembled all parts in preparation for deburr.