Date:    7-20-2011
Number of Hours:    1.80
Brief Description:    Engine Baffle Work
Drilled all 4 of the angle attach pieces for the side baffles.

Finessed the fit of the right side baffles. Determined ultimate placement.

Drilled the aft baffle holes thru the engine case; installed self-tapping screws to hold the baffle against the case firmly.

Re-bent several baffle pieces in a trial and error method to get a good fit.