| Date: |
2-24-2011 |
|
| Number of Hours: |
1.30 |
|
| Brief Description: |
Engine FWF Wiring |
|
|
Installed EGT probes into exhaust stacks. Routed / re-routed wires on the right side of the engine. Relocated the oil pressure sending unit wire from on top of the engine over to the side so that it can be braced against the intake manifold. Started wiring CHTs to the RDAC. |
||