Date:    1-17-2009
Number of Hours:    2.20
Brief Description:    Prep work for Left Lower Aft Skin
After riveting the upper aft skin on the left wing, flipped the wing over. Deburred underside of main spar. Deburred outside flanges of ribs.

Installed aileron bellcrank inspection hole cover.

Removed skin. Up-drilled tie-down ring hole in the skin to 3/4". Installed tie-down ring.

Installed bushings into two MW-5 rod end bearings to allow use of AN3 hardware. Reduced length of thrust bushing to allow tight fit of the short control rod onto the aileron bellcrank.

Just need to deburr inside edges of ribs, aft spar, and top surface of main spar, bolt the long and short control rods to the aileron bellcrank, then deburr the skin, and rivet.