| Date: |
4-21-2010 |
|
| Number of Hours: |
0.70 |
|
| Brief Description: |
Finish Vert Stab Hardware |
|
|
Finished installation of hard-to-reach AN3 hardware securing the vertical stabilizer aft spar to the lower aft fuselage. Torqued hardware. Tightened and torqued the front spar of the vertical stab-to-horiz stab attachment. Re-installed rudder. Now I can finish filing the rudder control horn to ensure 25 degrees rudder swing. |
||