| Date: |
6-2-2008 |
|
| Number of Hours: |
1.10 |
|
| Brief Description: |
Horiz Stab Front Spar Channel |
|
|
Previously had only cut SNX-T03-06 L&R channel stock to rough length. Tonight, I cut to final length, trimmed edges, bent to 22 deg angle, and drilled all pilot holes. Next step will be to trial-fit these pieces onto horizontal stabilizer front spar. |
||