| Date: |
5-10-2008 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Vertical Stab Frame |
|
|
After messing with the bolts, riveted the main spar, and cleco'd the vertical stabilizer ribs / channel sections together for trial fit. |
||