Date:    4-29-2009
Number of Hours:    1.10
Brief Description:    Align / Pilot Drill Lower Crosstie
This is slow-going.

Spent time aligning the fuselage sides. Pilot-drilled the right side of the #1 lower crosstie. Pilot drilled (one hole each side) the #2 lower crosstie. Positioned and clamped #3 lower crosstie. Because of the flex of my workbench, I think I'm going to move the entire aft fuse to 3 sawhorses, allowing me to crawl up underneath instead of shimmying thru the fuse on the bench.