| Date: |
4-29-2009 |
|
| Number of Hours: |
1.10 |
|
| Brief Description: |
Align / Pilot Drill Lower Crosstie |
|
|
This is slow-going. Spent time aligning the fuselage sides. Pilot-drilled the right side of the #1 lower crosstie. Pilot drilled (one hole each side) the #2 lower crosstie. Positioned and clamped #3 lower crosstie. Because of the flex of my workbench, I think I'm going to move the entire aft fuse to 3 sawhorses, allowing me to crawl up underneath instead of shimmying thru the fuse on the bench. |
||