| Date: |
4-25-2009 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Fit / Drill new Lower Splice Plates |
|
|
After chamfering the edges last time, tonight was the time to mate them and fit to the longerons. Up-drilled two of the holes on each assembly to 3/16". These are the only holes to be taken up to final size at this point in the assembly. |
||