| Date: |
4-17-2009 |
|
| Number of Hours: |
1.40 |
|
| Brief Description: |
Complete Cross Tie Box |
|
|
Finished pilot drilling the SNX-F24-01 cross tie box. Took lots of measurements and had to reposition several times to maintain the 3" width and to ensure squareness. Up-drilled all holes. Disassembled, deburred, re-assembled. At this point, only the top surface & web are riveted, but the lower surface is final-drilled in preparation for riveting after installation into the fuselage. |
||