Date:    4-9-2009
Number of Hours:    1.10
Brief Description:    Debur Right Aft Fuse Side Panel sub assy
Similar to work from last night. Had disassembled everything last night, and had deburred the longeron. Tonight I deburred the skin and the vertical channels. Assembled the fairlead blocks to channels number 1 & 5. Inserted grommets in the other holes as per plans.