| Date: |
3-23-2009 |
|
| Number of Hours: |
0.90 |
|
| Brief Description: |
Vertical Channel Fab |
|
|
Trimmed SNX-F27-03R to length. Marked location of all holes and angle stock relief cuts. Drilled pilot holes for future rivets, and up-drilled the 3/4" and 5/16" rudder / trim cable holes. Trimmed SNX-F27-03L to length. Made angle stock relief cuts, and drilled 3/4" and 5/16" cable holes. Have not yet marked the 20 rivet holes. |
||